What does a three-phase 200 V service connection cost? Comparing alternatives

Factors to consider when installation costs or rental restrictions affect access to three-phase 200 V.

This is a technical guide to consider the feasible method from the conditions of site registration and the specifications of the equipment used. It does not guarantee the conformity of the equipment only with the description.

Service connection costs vary by site

A new three-phase 200 V service depends on the building and available utility supply. Costs vary with utility requirements, connection routing, feeders, distribution boards, breakers, equipment capacity and building work. There is no single fixed price.

In addition to construction costs, it is important to compare contracts and basic fees. Please refer to the estimate of electricity companies and electric construction companies for specific amounts and construction periods.

5 confirmations when taking a quote

  1. Address and building that can supply three-phase 200V
  2. Total capacity and maximum starting current of the machine used
  3. Cable length from the service entrance to the machine, and the scope of installation work
  4. Contracts for rent, contracts for managers, and original recovery conditions
  5. Construction period and future machinery expansion and factory relocation

Option to use existing single-phase 200V

If a single-phase 200V circuit with sufficient supply capacity is available,Single Phase 200V Input Three Phase Converter There is also a way to secure a three-phase three-wire 200V power supply. There is a case where new three-phase power transmission is unnecessary, but it may be necessary to install a single-phase circuit strengthening work and protection equipment.

INV-9600PTV has up to 9.6kVA and 12kVA and 24kVA models. It is necessary to confirm conformity, including the starting current of the load and the required power supply quality.

Which one should you choose

  • New three-phase service:It will be a comparative candidate in the field where large capacity equipment is continuously used and there is an expectation to be expanded in the future.
  • Phase converter:It is worth considering rental properties and facilities with relocation that are difficult to draw three phases.
  • Temporary generator:An option for periods or sites where no suitable supply is available.

In comparison, you need to organize equipment costs, electrical construction costs, maintenance costs, electrical charges, etc. in the same terms of use. Using a converter, construction costs will always be cheaper.

Information you want to organize before making an inquiry

Please check the installation location (ownership and rental), current single-phase 200V supply capacity, the model and nameplate of the three-phase equipment you want to use, and the operation time and start method. It is useful for comparing with the three-phase power receiving work.

Please contact us for 3-phase 200V power supply.

Please let us know the type, nameplate photo and start method of the machine and the conditions of the single-phase 200V power supply available on site. We will check the compatibility and capacity selection.