It is a guide to organize the specifications and power supply conditions of the equipment. Actual conformity is determined by confirming the model and site conditions.
Compressor specific checkpoints
- Load at start: Check whether the pressure is left or unloaded.
- Start-up frequency:Check the number of times and intervals of automatic restart by pressure switch.
- Control circuit: check supply requirements for contactors, control transformers and dryers.
- Concurrent use: When other machines connect to the same three-phase power supply, the load is calculated.
Single-phase 200V input circuit is also confirmed
When moving the three-phase 200V device from a single-phase 200V, it is necessary to check the current, circuit breaker, and wiring of the single-phase side. The motor rated current of the output side can not be treated as the required current of the single-phase side as it is. It is not possible to use it only by connecting to the existing outlet.
Based on the conditions of continuous operation and re-start, check whether the existing single-phase circuit can be installed or installed on-site electrical equipment.
When using our three-phase converter
INV-9600PTV Input a single phase 200V and output a sine wave of three phases 200V and 50/60Hz. The maximum output of 9.6kVA can start and drive individual compressors depending on the model and load conditions.
If you have the power quality or start method required by the manufacturer, regardless of the stationary type or portable type, we will prioritize the specification.
What you want to prepare at the time of consultation
- Model and nameplate photo of compressor
- Motor output, current, 50/60Hz, start method
- Specifications of accessories such as dryer and control circuit
- Single-phase 200V circuit equipment information and usage frequency
Please consider connecting to the facility and changing the protective device with the qualified person who can check the site.
Please contact us from the type of equipment.
If you have a nameplate photo and a single-phase 200V power supply that can be used, you can organize your confirmation.